IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
Reset
NAICS 322299 All Other Converted Paper Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0360 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $8,778 $1,000 Not Implemented
UM0360 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $65,841 $24,120 Not Implemented
UM0360 # 03 Y:2010 03 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,348 $8,750 Not Implemented
UM0360 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $14,135 $31,924 Not Implemented
UM0360 # 05 Y:2010 05 2010 OPTIMIZE PLANT POWER FACTOR $6,734 $14,340 Not Implemented
UM0360 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,240 $200 Not Implemented
UM0360 # 07 Y:2010 07 2010 USE RADIANT HEATER FOR SPOT HEATING $45,305 $14,000 Not Implemented
UM0360 # 08 Y:2010 08 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,583 $2,000 Not Implemented
UM0360 # 09 Y:2010 09 2010 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $6,913 $2,000 Not Implemented
MA0631 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,384 $27,090 Implemented
MA0631 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,021 $0 Implemented
MA0631 # 03 Y:2008 03 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $609 $0 Implemented
MA0631 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $200 Implemented
GT0840 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,598 $30,000 Not Implemented
GT0840 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,574 $0 Not Implemented
GT0840 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,377 $14,862 Implemented
GT0840 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $515 $2,301 Implemented
GT0840 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,943 $3,750 Implemented
GT0840 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $830 $2,500 Not Implemented
WI0497 # 01 Y:2005 01 2005 $72,000 $85,000 Not Implemented
WI0497 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,415 $4,000 Not Implemented
WI0497 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,445 $86,400 Implemented
WI0497 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,421 $0 Implemented
WI0497 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $4,656 $500 Implemented
WI0497 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $60 Implemented