IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,910

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0426 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,768 $62,963 Not Implemented
MI0426 # 06 Y:2023 06 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $4,219 $12,866 Not Implemented
UW2306 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $227 $344 Not Implemented
UW2306 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,231 $0 Not Implemented
UW2306 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,732 $2,080 Not Implemented
UW2306 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,916 $6,000 Not Implemented
UW2306 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $9,881 $14,306 Not Implemented
MZ0342 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $120 Implemented
MZ0342 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $433 $220 Not Implemented
MZ0342 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $5,030 $3,700 Implemented
MZ0342 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $157 $80 Not Implemented
MZ0342 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,266 $5,828 Implemented
SD0634 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $585 $250 Implemented
SD0634 # 04 Y:2023 04 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,998 $15,050 Implemented
SD0634 # 03 Y:2023 03 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,222 $2,580 Implemented
SD0634 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,518 $700 Implemented
SD0634 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $942 $3,568 Implemented
SD0634 # 06 Y:2023 06 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,780 $11,100 Implemented
SD0634 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,771 $108,198 Implemented
MI0419 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,018 $4,860 Not Implemented
MI0419 # 03 Y:2023 03 2023 PAY UTILITY BILLS ON TIME $15,232 $0 Implemented
MI0419 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,061 $1,060 Implemented
MI0419 # 02 Y:2023 02 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,853 $37,026 Implemented
MI0419 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,550 $2,325 Implemented
CC0013 # 03 Y:2023 03 2023 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $4,697 $8,400 n/a