IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0405 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,270 $4,650 Not Implemented
SD0405 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,436 $3,324 Not Implemented
SD0405 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,411 $3,110 Not Implemented
SD0405 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $606 $256 Implemented
SD0405 # 02 Y:2008 02 2008 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $62,965 $69,500 Implemented
SD0405 # 01 Y:2008 01 2008 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $117,665 $1,117,600 Implemented
MA0632 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $383 $650 Implemented
MA0632 # 06 Y:2008 06 2008 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,149 $11,000 Not Implemented
MA0632 # 05 Y:2008 05 2008 REDUCE VENTILATION AIR $2,499 $9,000 Implemented
MA0632 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,265 $4,100 Implemented
MA0632 # 03 Y:2008 03 2008 AIR CONDITION ONLY SPACE NECESSARY $4,818 $19,300 Not Implemented
MA0632 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,185 $17,080 Not Implemented
MA0632 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,404 $14,500 Implemented
UF0409 # 11 Y:2008 11 2008 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,589 $794 Implemented
UF0409 # 15 Y:2008 15 2008 REUSE / RECYCLE/ SELL PAPER PRODUCTS $46,911 $0 Implemented
UF0409 # 14 Y:2008 14 2008 $76,789 $12,000 Not Implemented
UF0409 # 13 Y:2008 13 2008 INSTALL OCCUPANCY SENSORS $1,180 $162 Not Implemented
UF0409 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,401 $10,282 Not Implemented
UF0409 # 10 Y:2008 10 2008 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,511 $406 Not Implemented
UF0409 # 09 Y:2008 09 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,491 $25,340 Not Implemented
UF0409 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,400 $10,830 Not Implemented
UF0409 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,082 $24,230 Not Implemented
UF0409 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,158 $1,870 Implemented
UF0409 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $764 $2,390 Implemented
UF0409 # 04 Y:2008 04 2008 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,156 $20,960 Not Implemented