IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,910

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0356 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,479 $100 Implemented
AS0356 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $20 Implemented
AS0356 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $697 $675 Not Implemented
AS0356 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43 $87 Implemented
AS0356 # 08 Y:2003 08 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $39,566 $55,100 n/a
AS0356 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,865 $10,800 n/a
AS0356 # 10 Y:2003 10 2003 AIR CONDITION ONLY SPACE NECESSARY $957 $4,260 Not Implemented
AS0356 # 11 Y:2003 11 2003 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,280 $17,100 Implemented
AS0356 # 12 Y:2003 12 2003 $96,000 $8,340 Implemented
GT0758 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,720 $47,268 Implemented
GT0758 # 02 Y:2003 02 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,072 $12,000 Implemented
GT0758 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,895 $47,736 n/a
GT0758 # 04 Y:2003 04 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,438 $31,350 n/a
GT0758 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $322 $0 Implemented
GT0758 # 06 Y:2003 06 2003 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $28,386 $12,140 n/a
GT0758 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,773 $6,150 Not Implemented
GT0758 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $23,420 $1,850 Implemented
UF0321 # 01 Y:2003 01 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,390 $2,948 Not Implemented
UF0321 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $1,530 $868 Not Implemented
UF0321 # 03 Y:2003 03 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,331 $45,500 Implemented
UF0321 # 04 Y:2003 04 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,451 $740 Not Implemented
UF0321 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,598 $376 Not Implemented
UF0321 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,755 $852 Not Implemented
UF0321 # 07 Y:2003 07 2003 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $15,954 $436 Implemented
UF0321 # 08 Y:2003 08 2003 $18,000 $4,000 Implemented