Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,978
matching recommendationsNAICS | 3231 | Printing and Related Support Activities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0626 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,036 | $15,920 | n/a |
UF0626 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,655 | $12,290 | n/a |
UF0626 # 11 Y:2024 | 11 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,597 | $60,000 | n/a |
IC0319 # 02 Y:2025 | 02 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,099 | $14,469 | n/a |
UL2418 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,804 | $332,223 | n/a |
UL2418 # 01 Y:2024 | 01 | 2024 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $5,142 | $6,500 | n/a |
UL2418 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $160 | $1,155 | n/a |
IC0319 # 08 Y:2025 | 08 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,088 | $20,716 | n/a |
IC0319 # 13 Y:2025 | 13 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $799 | $519 | n/a |
IC0319 # 12 Y:2025 | 12 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,597 | $5,347 | n/a |
IC0319 # 09 Y:2025 | 09 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,027 | $0 | n/a |
IC0319 # 10 Y:2025 | 10 | 2025 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $4,445 | $3,414 | n/a |
IC0319 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $275 | $0 | n/a |
IC0319 # 03 Y:2025 | 03 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,428 | $0 | n/a |
IC0319 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,018 | $5,197 | n/a |
IC0319 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $2,117 | $2,486 | n/a |
IC0319 # 11 Y:2025 | 11 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $33,790 | $16,614 | n/a |
IC0319 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $295 | $481 | n/a |
IC0319 # 01 Y:2025 | 01 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,393 | $16,567 | n/a |
WV0675 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $163,920 | $663,966 | Not Implemented |
WV0675 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,514 | $29,651 | Implemented |
WV0675 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $24,663 | $80,657 | Not Implemented |
WV0675 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $6,065 | $25,395 | Implemented |
WV0675 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,934 | $4,653 | Not Implemented |
WV0675 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,602 | $252 | Implemented |