IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,910

matching recommendations
Reset
NAICS 3231 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0068 # 07 Y:2011 07 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $31 $0 Implemented
MZ0068 # 08 Y:2011 08 2011 CLEAR AND RENT EXISTING SPACE $17,500 $0 Not Implemented
MZ0069 # 01 Y:2011 01 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,000 $10,000 Not Implemented
MZ0069 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $1,390 $4,830 Not Implemented
MZ0069 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $87 $0 Implemented
MZ0069 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,586 $820 Implemented
MZ0069 # 05 Y:2011 05 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,830 $1,000 Not Implemented
MZ0069 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $0 Not Implemented
MZ0069 # 07 Y:2011 07 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $36,400 $0 Implemented
MZ0069 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $630 $250 Implemented
MZ0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $2,600 Implemented
MZ0069 # 10 Y:2011 10 2011 CONSIDER INTERMEDIATE OR ECONOMY SIZE AUTOS / TRUCKS $65,000 $85,000 Not Implemented
MZ0069 # 11 Y:2011 11 2011 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $120,000 $150,000 Not Implemented
MZ0069 # 12 Y:2011 12 2011 USE PLASTIC PALLETS INSTEAD OF WOOD $25,000 $5,000 Not Implemented
MZ0069 # 13 Y:2011 13 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $35,000 $8,500 Not Implemented
MZ0069 # 14 Y:2011 14 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $115,000 $12,500 Not Implemented
MZ0069 # 15 Y:2011 15 2011 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $115,000 $125,000 Implemented
TT0076 # 01 Y:2011 01 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,311 $0 Implemented
TT0076 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,661 $5,000 Implemented
TT0076 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,735 $1,654 Not Implemented
TT0076 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,371 $4,540 Not Implemented
TT0076 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,101 $13,238 Not Implemented
MI0212 # 01 Y:2011 01 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,567 $75,000 Not Implemented
MI0212 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $9,200 Not Implemented
MI0212 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,091 $2,600 Not Implemented