IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,950

matching recommendations
Reset
NAICS 3231 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0402 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,346 $9,200 Implemented
WV0402 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $13,296 $2,000 Not Implemented
WV0402 # 06 Y:2010 06 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $12,095 $4,000 Not Implemented
WV0402 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,390 $0 Implemented
IA0448 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,064 $560 Implemented
IA0448 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $21,840 $1,000 Implemented
IA0448 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,986 $50 Not Implemented
IA0448 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,736 $1,440 Implemented
IA0448 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $1,274 $2,000 Not Implemented
IA0448 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,798 $800 Implemented
IA0448 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $371 $1,000 Not Implemented
IA0448 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $5,763 $2,360 Not Implemented
IA0448 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,501 $6,360 Implemented
CO0632 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,960 $18,470 Implemented
CO0632 # 02 Y:2010 02 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,290 $21,810 Not Implemented
CO0632 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,870 $1,220 Not Implemented
CO0632 # 04 Y:2010 04 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $1,760 $10,500 Not Implemented
CO0632 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $2,030 Not Implemented
CO0625 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,200 $1,500 Not Implemented
CO0625 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,150 $17,870 Not Implemented
CO0625 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,160 $30,500 Not Implemented
CO0625 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $680 $2,020 Not Implemented
CO0625 # 05 Y:2009 05 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $210 Not Implemented
MZ0039 # 01 Y:2009 01 2009 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $48,883 $510,446 Implemented
MZ0039 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,294 $8,400 Implemented