Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
861
matching recommendationsNAICS | 32311 | Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1075 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,565 | $2,238 | Implemented |
UD1075 # 07 Y:2024 | 07 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $712,662 | $195,000 | Implemented |
UD1075 # 05 Y:2024 | 05 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $712 | $0 | Implemented |
UD1075 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,038 | $7,596 | Implemented |
UD1075 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $829 | $0 | Implemented |
UD1075 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $952 | Implemented |
MI0426 # 09 Y:2023 | 09 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,177 | $1,660 | Implemented |
MI0426 # 03 Y:2023 | 03 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $11,974 | $0 | Implemented |
MI0426 # 04 Y:2023 | 04 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,404 | $630 | Implemented |
MI0426 # 07 Y:2023 | 07 | 2023 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $3,449 | $1,600 | Implemented |
MI0426 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,593 | $0 | Implemented |
MZ0342 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $570 | $120 | Implemented |
MZ0342 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $5,030 | $3,700 | Implemented |
MZ0342 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,266 | $5,828 | Implemented |
SD0634 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,518 | $700 | Implemented |
SD0634 # 03 Y:2023 | 03 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,222 | $2,580 | Implemented |
SD0634 # 04 Y:2023 | 04 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,998 | $15,050 | Implemented |
SD0634 # 05 Y:2023 | 05 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,771 | $108,198 | Implemented |
SD0634 # 06 Y:2023 | 06 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,780 | $11,100 | Implemented |
SD0634 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $942 | $3,568 | Implemented |
SD0634 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $585 | $250 | Implemented |
MI0419 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $28,061 | $1,060 | Implemented |
MI0419 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,550 | $2,325 | Implemented |
MI0419 # 03 Y:2023 | 03 | 2023 | PAY UTILITY BILLS ON TIME | $15,232 | $0 | Implemented |
MI0419 # 02 Y:2023 | 02 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $19,853 | $37,026 | Implemented |