IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

861

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0303 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $879 $1,660 Implemented
MI0303 # 12 Y:2016 12 2016 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $325 $173 Implemented
MI0303 # 13 Y:2016 13 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $190 $80 Implemented
LE0424 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,742 $1,000 Implemented
LE0424 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,378 $600 Implemented
LE0424 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $7,795 $2,750 Implemented
LE0424 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,065 $3,420 Implemented
WM0094 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,037 $1,640 Implemented
WM0093 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,577 $1,680 Implemented
OR0674 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,376 $4,258 Implemented
OR0674 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,953 $0 Implemented
WM0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,362 $1,245 Implemented
SD0534 # 02 Y:2016 02 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $12,021 $5,775 Implemented
SD0534 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,898 $9,052 Implemented
SD0534 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $357 $200 Implemented
BD0478 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,978 $3,229 Implemented
BD0478 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,961 $15 Implemented
BD0478 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,217 $1,000 Implemented
BD0478 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $784 $900 Implemented
BD0478 # 08 Y:2016 08 2016 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,019 $7,560 Implemented
WM0085 # 04 Y:2016 04 2016 REPAIR AND ELIMINATE STEAM LEAKS $696 $180 Implemented
DL0163 # 01 Y:2016 01 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $30,630 $2,700 Implemented
DL0163 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,110 $55,940 Implemented
WV0519 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $161,462 $330,000 Implemented
WV0519 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,853 $50,000 Implemented