Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
114
matching recommendationsNAICS | 32311 | Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0071 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,566 | $3,150 | Implemented |
WM0071 # 11 Y:2015 | 11 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,937 | $244 | Implemented |
WM0071 # 12 Y:2015 | 12 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,354 | $540 | Implemented |
WM0071 # 13 Y:2015 | 13 | 2015 | INSTALL OCCUPANCY SENSORS | $986 | $345 | Not Implemented |
WM0071 # 14 Y:2015 | 14 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $633 | $984 | Not Implemented |
WM0022 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $12,280 | $30,697 | Not Implemented |
WM0022 # 02 Y:2013 | 02 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,779 | $6,480 | Implemented |
WM0022 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $2,744 | $2,303 | Implemented |
WI0505 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $105,600 | $2,700 | Implemented |
WI0505 # 02 Y:2006 | 02 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $38,400 | $1,000 | Not Implemented |
WI0505 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,774 | $6,289 | Implemented |
WI0505 # 04 Y:2006 | 04 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,380 | $3,200 | Not Implemented |
WI0505 # 05 Y:2006 | 05 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,205 | $7,840 | Implemented |
WI0505 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,153 | $0 | Implemented |
WI0491 # 01 Y:2005 | 01 | 2005 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $23,636 | $25,000 | Not Implemented |
WI0491 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,939 | $15,000 | Not Implemented |
WI0491 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,911 | $5,000 | Implemented |
WI0491 # 04 Y:2005 | 04 | 2005 | IMPROVE LUBRICATION PRACTICES | $1,322 | $2,340 | Not Implemented |
WI0491 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $1,112 | $1,680 | Implemented |
WI0491 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $706 | $1,244 | Implemented |
WI0450 # 01 Y:2003 | 01 | 2003 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $137,202 | $84,000 | Not Implemented |
WI0450 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,456 | $144,540 | n/a |
WI0450 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $10,369 | $22,000 | Not Implemented |
WI0450 # 04 Y:2003 | 04 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,686 | $5,767 | Not Implemented |
WI0450 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,580 | $12,500 | Not Implemented |