IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,850

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0418 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $6,612 $550 n/a
AS0418 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,272 $1,000 n/a
AS0418 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,394 $1,900 n/a
AS0418 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,386 $3,000 n/a
AS0418 # 08 Y:2006 08 2006 USE SOLAR HEAT TO HEAT WATER $358 $2,800 n/a
BD0306 # 01 Y:2006 01 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $26,169 $32,500 Implemented
BD0306 # 02 Y:2006 02 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,891 $4,000 Implemented
BD0306 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $15,291 $1,368 Implemented
BD0306 # 04 Y:2006 04 2006 USE RADIANT HEATER FOR SPOT HEATING $13,127 $27,572 Implemented
BD0306 # 05 Y:2006 05 2006 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $424 $237 Implemented
BD0306 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $2,979 $1,350 Implemented
BD0306 # 07 Y:2006 07 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,520 $4,820 Not Implemented
BD0306 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $900 Implemented
MA0600 # 01 Y:2006 01 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $24,000 $0 Not Implemented
MA0600 # 02 Y:2006 02 2006 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $8,271 $12,700 Not Implemented
MA0600 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,209 $17,438 Not Implemented
MA0600 # 04 Y:2006 04 2006 OPTIMIZE PLANT POWER FACTOR $5,321 $10,000 Not Implemented
MA0600 # 05 Y:2006 05 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,683 $2,000 Not Implemented
MA0600 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,507 $5,000 Not Implemented
WV0335 # 01 Y:2006 01 2006 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $151,578 $97,142 Not Implemented
WV0335 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $127,911 $14,450 Implemented
WV0335 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,924 $250 Not Implemented
WV0335 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $6,057 $240 Implemented
WV0335 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,865 $1,420 Implemented
WV0335 # 06 Y:2006 06 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,785 $5,803 Implemented