Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,874
matching recommendationsNAICS | 32311 | Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0335 # 08 Y:2006 | 08 | 2006 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $985 | $1,680 | Implemented |
MA0598 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $25,324 | $45,333 | Not Implemented |
MA0598 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,748 | $1,125 | Implemented |
MA0598 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,315 | $18,065 | Implemented |
MA0598 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $4,500 | $4,314 | Implemented |
MA0598 # 05 Y:2006 | 05 | 2006 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $2,571 | $3,000 | Not Implemented |
MA0598 # 06 Y:2006 | 06 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $716 | $500 | Not Implemented |
MA0598 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $300 | Implemented |
AM0502 # 01 Y:2006 | 01 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $288,000 | $675,000 | Implemented |
AM0502 # 02 Y:2006 | 02 | 2006 | REUSE RAGS UNTIL COMPLETELY SOILED | $82,500 | $0 | Implemented |
AM0502 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39,000 | $6,000 | Implemented |
AM0502 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $29,100 | $15,000 | Implemented |
AM0502 # 05 Y:2006 | 05 | 2006 | MODIFY WORKLOAD | $25,000 | $25,000 | Not Implemented |
AM0502 # 06 Y:2006 | 06 | 2006 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,983 | $0 | Implemented |
AM0502 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,650 | $15 | Not Implemented |
AM0502 # 08 Y:2006 | 08 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,900 | $1,000 | Implemented |
AM0502 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,900 | $1,000 | Implemented |
AM0502 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $3,340 | $340 | Implemented |
AM0502 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,200 | $2,730 | Implemented |
AM0502 # 12 Y:2006 | 12 | 2006 | USE SYNTHETIC LUBRICANT | $800 | $0 | Not Implemented |
AM0502 # 13 Y:2006 | 13 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $510 | Implemented |
AM0502 # 14 Y:2006 | 14 | 2006 | USE PHOTOCELL CONTROLS | $200 | $0 | Implemented |
WI0505 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $105,600 | $2,700 | Implemented |
WI0505 # 02 Y:2006 | 02 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $38,400 | $1,000 | Not Implemented |
WI0505 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,774 | $6,289 | Implemented |