IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0557 # 04 Y:2020 04 2020 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,850 $4,249 Not Implemented
SF0557 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $14,452 $19,258 Not Implemented
SF0557 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,387 $350 Not Implemented
SF0557 # 01 Y:2020 01 2020 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $232 $0 Not Implemented
UU0166 # 01 Y:2020 01 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $18,960 $212,180 Implemented
UU0166 # 07 Y:2020 07 2020 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $443 $300 Implemented
UU0166 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,545 $1,200 Not Implemented
UU0166 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,448 $1,660 Not Implemented
UU0166 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,409 $600 Implemented
UU0166 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $912 $100 Not Implemented
UU0166 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,704 $52,483 Implemented
LE0495 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,587 $20,636 Not Implemented
LE0495 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $122 $360 Not Implemented
LE0495 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,360 $1,375 Not Implemented
LE0495 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,226 $270 Not Implemented
LE0495 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,183 $360 Not Implemented
LE0495 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,065 $40 Not Implemented
CL2006 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,133 $4,500 Implemented
CL2006 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,314 $3,400 Implemented
CL2006 # 04 Y:2020 04 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,769 $12,768 Not Implemented
CL2006 # 03 Y:2020 03 2020 MODIFY STARTUP/SHUTDOWN TIMES $7,541 $1,000 Not Implemented
CL2006 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,598 $51,573 Implemented
NL0046 # 03 Y:2020 03 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,717 $5,000 Implemented
NL0046 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,816 $3,372 Implemented
NL0046 # 01 Y:2020 01 2020 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $5,384 $20,000 Implemented