IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0569 # 04 Y:2021 04 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,766 $5,229 Implemented
UF0569 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,252 $1,985 Implemented
UF0569 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,925 $25,340 Not Implemented
UF0569 # 07 Y:2021 07 2021 USE OPTIMUM TEMPERATURE $3,887 $0 Implemented
UF0569 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,828 $23,023 Implemented
UF0569 # 08 Y:2021 08 2021 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,742 $3,746 Not Implemented
UF0522 # 09 Y:2018 09 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,753 $688 Implemented
UF0522 # 01 Y:2018 01 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $36,742 $240,000 Not Implemented
UF0522 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $21,070 $48,000 Not Implemented
UF0522 # 10 Y:2018 10 2018 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $60,514 $190,580 Not Implemented
UF0522 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,481 $1,413 Implemented
UF0522 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $10,267 $0 Implemented
UF0522 # 02 Y:2018 02 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $87,600 $7,358 Not Implemented
UF0522 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,837 $0 Implemented
UF0522 # 05 Y:2018 05 2018 INSTALL SKYLIGHTS $9,473 $48,000 Not Implemented
UF0522 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $4,644 $797 Implemented
UF0519 # 04 Y:2018 04 2018 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,569 $45,225 Implemented
UF0519 # 01 Y:2018 01 2018 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $27,363 $868 Implemented
UF0519 # 05 Y:2018 05 2018 ISOLATE HOT OR COLD EQUIPMENT $6,694 $2,710 Not Implemented
UF0519 # 06 Y:2018 06 2018 UPGRADE CONTROLS ON COMPRESSORS $5,422 $25,600 Not Implemented
UF0519 # 10 Y:2018 10 2018 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,226 $5,454 Not Implemented
UF0519 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $17,618 $30,000 Not Implemented
UF0519 # 08 Y:2018 08 2018 INSTALL COMMON HEADER ON COMPRESSORS $2,514 $3,216 Not Implemented
UF0519 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,687 $1,850 Implemented
UF0519 # 07 Y:2018 07 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,271 $25,600 Not Implemented