IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0075 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $1,880 $330 Not Implemented
WM0075 # 06 Y:2015 06 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,069 $852 Not Implemented
WM0075 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,025 $1,280 Not Implemented
WM0075 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,819 $46,125 Not Implemented
WM0075 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,881 $34,000 Not Implemented
WM0075 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $68,035 $93,132 Not Implemented
WM0075 # 01 Y:2015 01 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $331,900 $300,000 Not Implemented
WM0071 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,566 $3,150 Implemented
WM0071 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $104,990 $300,000 Not Implemented
WM0071 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,586 $36,000 Not Implemented
WM0071 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,236 $23,560 Implemented
WM0071 # 04 Y:2015 04 2015 USE SYNTHETIC LUBRICANT $9,301 $18,000 Implemented
WM0071 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,537 $0 Implemented
WM0071 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,515 $7,500 Not Implemented
WM0071 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,489 $1,292 Not Implemented
WM0071 # 08 Y:2015 08 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,853 $230 Not Implemented
WM0071 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,707 $12,750 Implemented
WM0071 # 11 Y:2015 11 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,937 $244 Implemented
WM0071 # 12 Y:2015 12 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,354 $540 Implemented
WM0071 # 13 Y:2015 13 2015 INSTALL OCCUPANCY SENSORS $986 $345 Not Implemented
WM0071 # 14 Y:2015 14 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $633 $984 Not Implemented
WI0505 # 05 Y:2006 05 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,205 $7,840 Implemented
WI0505 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $105,600 $2,700 Implemented
WI0505 # 02 Y:2006 02 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $38,400 $1,000 Not Implemented
WI0505 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,774 $6,289 Implemented