IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,649

matching recommendations
Reset
NAICS 323111 Commercial Printing (except Screen and Books)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0828 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,598 $500 Not Implemented
UD0828 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,066 $5,000 Not Implemented
UD0828 # 13 Y:2010 13 2010 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,653 $25 Implemented
UD0828 # 14 Y:2010 14 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,308 $25 Not Implemented
UD0828 # 15 Y:2010 15 2010 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $990 $250 Not Implemented
UD0828 # 16 Y:2010 16 2010 RECOVER WASTE HEAT FROM EQUIPMENT $52,035 $62,500 Not Implemented
UD0828 # 17 Y:2010 17 2010 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $15,589 $35,000 Not Implemented
UD0828 # 18 Y:2010 18 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,601 $25 Not Implemented
IC0179 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $203 $82 Implemented
IC0179 # 02 Y:2010 02 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,268 $0 Not Implemented
IC0179 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $389 $2,833 Implemented
IC0179 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $626 Implemented
IC0179 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,072 $34,800 Not Implemented
IC0179 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,064 $3,510 Not Implemented
IC0179 # 07 Y:2010 07 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $357 $0 Not Implemented
UF0437 # 01 Y:2010 01 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,679 $4,000 Not Implemented
UF0437 # 02 Y:2010 02 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,263 $4,600 Not Implemented
UF0437 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,562 $5,039 Not Implemented
UF0437 # 04 Y:2010 04 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $457 $0 Not Implemented
UF0437 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,443 $4,200 Not Implemented
UF0437 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,608 $469 Not Implemented
UF0437 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,197 $1,979 Not Implemented
UF0437 # 08 Y:2010 08 2010 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,387 $1,200 Not Implemented
UF0437 # 09 Y:2010 09 2010 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $4,523 $0 Not Implemented
UA0056 # 04 Y:2010 04 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,615 $2,000 Implemented