Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0166 # 07 Y:2020 | 07 | 2020 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $443 | $300 | Implemented |
UU0166 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $912 | $100 | Not Implemented |
UU0166 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,409 | $600 | Implemented |
UU0166 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,448 | $1,660 | Not Implemented |
UU0166 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,545 | $1,200 | Not Implemented |
UU0166 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,704 | $52,483 | Implemented |
UU0166 # 01 Y:2020 | 01 | 2020 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $18,960 | $212,180 | Implemented |
UU0092 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $740 | $280 | Not Implemented |
UU0092 # 04 Y:2005 | 04 | 2005 | USE PHOTOCELL CONTROLS | $1,130 | $1,800 | Not Implemented |
UU0092 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,083 | $3,270 | Not Implemented |
UU0092 # 02 Y:2005 | 02 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,250 | $19,000 | Not Implemented |
UU0092 # 01 Y:2005 | 01 | 2005 | USE SOY OR WATER-BASED INKS | $28,070 | $20,000 | Not Implemented |
UU0091 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $12,500 | $15,290 | Not Implemented |
UU0091 # 04 Y:2005 | 04 | 2005 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $250 | $75 | Not Implemented |
UU0091 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $180 | Not Implemented |
UU0091 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,360 | $420 | Not Implemented |
UU0091 # 01 Y:2005 | 01 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,270 | $7,000 | Not Implemented |
UU0052 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $12,731 | $22,600 | n/a |
UU0052 # 09 Y:2003 | 09 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $50 | $0 | n/a |
UU0052 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,664 | $3,366 | n/a |
UU0052 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $392 | $594 | n/a |
UU0052 # 06 Y:2003 | 06 | 2003 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,237 | $410 | n/a |
UU0052 # 05 Y:2003 | 05 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,027 | $6,000 | n/a |
UU0052 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,302 | $1,661 | n/a |
UU0052 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,186 | $2,810 | n/a |