Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0006 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $980 | $0 | Implemented |
IP0006 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $1,771 | $730 | Implemented |
IP0006 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,847 | $1,416 | Not Implemented |
IP0006 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $490 | $1,156 | Not Implemented |
IP0006 # 06 Y:2012 | 06 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $18,261 | $92,692 | Implemented |
IP0006 # 07 Y:2012 | 07 | 2012 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $36,010 | $171,310 | Not Implemented |
IP0006 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,520 | $0 | Implemented |
WV0453 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,920 | $0 | Implemented |
WV0453 # 12 Y:2012 | 12 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $115 | $100 | Implemented |
WV0453 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $9,963 | $2,600 | Not Implemented |
WV0453 # 03 Y:2012 | 03 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,494 | $12,500 | Not Implemented |
WV0453 # 04 Y:2012 | 04 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,045 | $0 | Not Implemented |
WV0453 # 05 Y:2012 | 05 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $2,222 | $938 | Not Implemented |
WV0453 # 06 Y:2012 | 06 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $1,960 | $2,450 | Not Implemented |
WV0453 # 07 Y:2012 | 07 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,239 | $1,000 | Implemented |
WV0453 # 08 Y:2012 | 08 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $981 | $1,400 | Not Implemented |
WV0453 # 09 Y:2012 | 09 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $834 | $375 | Implemented |
WV0453 # 10 Y:2012 | 10 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $753 | $25 | Not Implemented |
WV0453 # 11 Y:2012 | 11 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $251 | $800 | Not Implemented |
MZ0080 # 07 Y:2012 | 07 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $306 | $0 | Not Implemented |
MZ0080 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,548 | $600 | Implemented |
MZ0080 # 05 Y:2012 | 05 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,554 | $0 | Not Implemented |
MZ0080 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,580 | $850 | Implemented |
MZ0080 # 03 Y:2012 | 03 | 2012 | CONDENSE OPERATION INTO ONE BUILDING | $13,624 | $0 | Implemented |
MZ0080 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,028 | $35,700 | Implemented |