Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0557 # 01 Y:2020 | 01 | 2020 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $232 | $0 | Not Implemented |
SF0557 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,387 | $350 | Not Implemented |
SF0557 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $14,452 | $19,258 | Not Implemented |
SF0557 # 04 Y:2020 | 04 | 2020 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,850 | $4,249 | Not Implemented |
UU0166 # 07 Y:2020 | 07 | 2020 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $443 | $300 | Implemented |
UU0166 # 01 Y:2020 | 01 | 2020 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $18,960 | $212,180 | Implemented |
UU0166 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,704 | $52,483 | Implemented |
UU0166 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,545 | $1,200 | Not Implemented |
UU0166 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,448 | $1,660 | Not Implemented |
UU0166 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,409 | $600 | Implemented |
UU0166 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $912 | $100 | Not Implemented |
LE0495 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,360 | $1,375 | Not Implemented |
LE0495 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $122 | $360 | Not Implemented |
LE0495 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,587 | $20,636 | Not Implemented |
LE0495 # 03 Y:2020 | 03 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,226 | $270 | Not Implemented |
LE0495 # 02 Y:2020 | 02 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $2,183 | $360 | Not Implemented |
LE0495 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,065 | $40 | Not Implemented |
CL2006 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,133 | $4,500 | Implemented |
CL2006 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,598 | $51,573 | Implemented |
CL2006 # 03 Y:2020 | 03 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $7,541 | $1,000 | Not Implemented |
CL2006 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,769 | $12,768 | Not Implemented |
CL2006 # 05 Y:2020 | 05 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,314 | $3,400 | Implemented |
NL0046 # 09 Y:2020 | 09 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $220 | $525 | Implemented |
NL0046 # 01 Y:2020 | 01 | 2020 | REPLACE ELECTRIC REHEAT WITH HEAT PIPES | $5,384 | $20,000 | Implemented |
NL0046 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,816 | $3,372 | Implemented |