Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
42
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0201 # 05 Y:2021 | 05 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,575 | $971 | Not Implemented |
DL0201 # 14 Y:2021 | 14 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,020 | $5,605 | Implemented |
DL0201 # 13 Y:2021 | 13 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $611 | $870 | Implemented |
DL0201 # 12 Y:2021 | 12 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,102 | $4,000 | Not Implemented |
DL0201 # 11 Y:2021 | 11 | 2021 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $263 | $0 | Not Implemented |
DL0201 # 10 Y:2021 | 10 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $129 | $18 | Not Implemented |
DL0201 # 09 Y:2021 | 09 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $169 | $0 | Implemented |
DL0201 # 08 Y:2021 | 08 | 2021 | INSTALL SET-BACK TIMERS | $1,842 | $0 | Implemented |
DL0201 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $68 | $0 | Implemented |
DL0201 # 06 Y:2021 | 06 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $638 | $423 | Implemented |
DL0201 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,065 | $0 | Implemented |
DL0201 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $93 | $0 | Not Implemented |
DL0201 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $175 | $500 | Implemented |
DL0201 # 01 Y:2021 | 01 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,922 | $0 | Not Implemented |
DL0201 # 15 Y:2021 | 15 | 2021 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $14,535 | $2,912 | Implemented |
WM0172 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $26,531 | $0 | Not Implemented |
WM0172 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,314 | $3,500 | Not Implemented |
WM0172 # 03 Y:2021 | 03 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $13,809 | $0 | Not Implemented |
WM0172 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,525 | $2,725 | Not Implemented |
WM0172 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,512 | $5,221 | Not Implemented |
WM0172 # 06 Y:2021 | 06 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,076 | $6,500 | Not Implemented |
WM0172 # 07 Y:2021 | 07 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,078 | $0 | Not Implemented |
WM0172 # 08 Y:2021 | 08 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $990 | $1,000 | Not Implemented |
UF0569 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,828 | $23,023 | Implemented |
UF0569 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,925 | $25,340 | Not Implemented |