IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 32312 Support Activities for Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0272 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,414 $200 Implemented
TT0272 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $51,568 $201,200 Not Implemented
TT0272 # 03 Y:2022 03 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,091 $200 Not Implemented
TT0272 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $63 Implemented
TT0272 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $651 $1,500 Implemented
SU0425 # 01 Y:2016 01 2016 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,154 $0 Implemented
SU0425 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,941 $13,422 Not Implemented
SU0425 # 06 Y:2016 06 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,344 $4,750 Implemented
SU0425 # 03 Y:2016 03 2016 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,946 $852 Not Implemented
SU0425 # 07 Y:2016 07 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,298 $2,828 Not Implemented
SU0425 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $396 Not Implemented
SU0425 # 02 Y:2016 02 2016 DISCONNECT BALLASTS $204 $0 Implemented
SU0425 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $5,242 $3,294 Not Implemented
WM0024 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $950 $550 Implemented
WM0024 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $974 Not Implemented
WM0024 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $287 $0 Implemented
WM0024 # 06 Y:2013 06 2013 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $827 $2,009 Implemented
WM0024 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $276 Not Implemented
WM0024 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,156 $0 Implemented
MZ0075 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,468 $1,000 Not Implemented
MZ0075 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,400 $1,500 Implemented
MZ0075 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $45,695 $2,700 Implemented
MZ0075 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,479 $29,900 Implemented
MZ0075 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,629 $1,700 Implemented
MZ0075 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,845 $6,160 Implemented