IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 32312 Support Activities for Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0846 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $249 $593 Not Implemented
UD0846 # 10 Y:2012 10 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,694 $0 Not Implemented
UD0846 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,109 $1,000 Not Implemented
UD0846 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $601 $1,000 Implemented
UD0846 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,577 $2,000 Not Implemented
UD0846 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,567 $0 Implemented
UD0846 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,542 $0 Not Implemented
UD0846 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,212 $2,054 Implemented
UD0846 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $5,608 $9,000 Not Implemented
UD0846 # 08 Y:2012 08 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,712 $38,000 Implemented
IA0448 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $371 $1,000 Not Implemented
IA0448 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,064 $560 Implemented
IA0448 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $21,840 $1,000 Implemented
IA0448 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,986 $50 Not Implemented
IA0448 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,736 $1,440 Implemented
IA0448 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $1,274 $2,000 Not Implemented
IA0448 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,798 $800 Implemented
IA0448 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $5,763 $2,360 Not Implemented
IA0448 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,501 $6,360 Implemented
SD0405 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $606 $256 Implemented
SD0405 # 02 Y:2008 02 2008 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $62,965 $69,500 Implemented
SD0405 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,507 $900 Implemented
SD0405 # 05 Y:2008 05 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,660 $4,270 Implemented
SD0405 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,270 $4,650 Not Implemented
SD0405 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,436 $3,324 Not Implemented