IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

819

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0423 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,606 $38,839 Not Implemented
UF0423 # 05 Y:2009 05 2009 REDESIGN PROCESS $206,074 $300,000 Not Implemented
UF0423 # 06 Y:2009 06 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $753 $0 Implemented
UF0423 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,505 $2,503 Not Implemented
UF0423 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $495 $315 Not Implemented
UF0423 # 09 Y:2009 09 2009 RECYCLE FLUORESCENT LAMPS $2,671 $3,405 Not Implemented
UF0423 # 10 Y:2009 10 2009 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,109 $283 Not Implemented
UF0423 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,767 $1,301 Implemented
UF0423 # 12 Y:2009 12 2009 INSULATE BARE EQUIPMENT $159,410 $5,591 Not Implemented
UF0423 # 13 Y:2009 13 2009 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,000 $0 Not Implemented
UF0423 # 14 Y:2009 14 2009 DEVELOP A REPAIR/REPLACE POLICY $3,460 $0 Implemented
UF0423 # 15 Y:2009 15 2009 General $8,403 $1,164 Not Implemented
UF0423 # 16 Y:2009 16 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,288 $506 Not Implemented
UF0423 # 17 Y:2009 17 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $68,520 $24,901 Not Implemented
AM0553 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $80,000 $960 Implemented
AM0553 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,080 $1,500 Implemented
AM0553 # 03 Y:2008 03 2008 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $19,260 $80,000 Not Implemented
AM0553 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $19,840 $30,650 Implemented
AM0553 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,380 $0 Implemented
AM0553 # 06 Y:2008 06 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,970 $500 Implemented
AM0553 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $630 $800 Not Implemented
AM0553 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $325 Implemented
UM0339 # 01 Y:2008 01 2008 USE OPTIMUM TEMPERATURE $136,461 $172,800 Not Implemented
UM0339 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $108,562 $15,000 Not Implemented
UM0339 # 03 Y:2008 03 2008 BURN WASTE OIL FOR HEAT $42,258 $4,000 Not Implemented