IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1074 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $1,700 $611 Not Implemented
OK1074 # 04 Y:2022 04 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,213 $895 Implemented
OK1074 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,520 Implemented
OK1074 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $187 Not Implemented
OK1074 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $362 $0 Not Implemented
OK1001 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,655 $15,329 Not Implemented
OK1001 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,178 $16,224 Not Implemented
OK1001 # 03 Y:2019 03 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,474 $11,240 Not Implemented
OK1001 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $3,509 Implemented
OK1001 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $1,894 $955 Not Implemented
OK0719 # 06 Y:2006 06 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $221 $225 Implemented
OK0719 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $49 $92 Not Implemented
OK0719 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $282 $80 Implemented
OK0719 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $249 $1,098 Not Implemented
OK0719 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $3,078 $1,637 Implemented
OK0719 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $13,491 $550 Implemented
OK0719 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,779 $157,975 Not Implemented
OK0690 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,252 $21,080 Implemented
OK0690 # 06 Y:2004 06 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $74,140 $1,000 Implemented
OK0690 # 05 Y:2004 05 2004 $2,000 $0 Implemented
OK0690 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $8,325 $800 Implemented
OK0690 # 03 Y:2004 03 2004 INSTALL SET-BACK TIMERS $2,316 $400 Implemented
OK0690 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $292 $706 Implemented