IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0871 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $6,228 $23,380 Not Implemented
AM0871 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $588 Implemented
AM0871 # 08 Y:2023 08 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,600 $2,000 Implemented
AM0871 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,880 $2,700 Implemented
AM0871 # 10 Y:2023 10 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $525 $0 Implemented
AM0871 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,678 $1,280 Implemented
AM0871 # 04 Y:2023 04 2023 USE SYNTHETIC LUBRICANT $3,265 $500 Implemented
AM0871 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,840 $30 Implemented
AM0871 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,890 $3,600 Implemented
AM0871 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $7,430 $10,320 Implemented
AM0841 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $4,790 $6,720 Implemented
AM0841 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $898 $598 Implemented
AM0841 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $25,385 $3,000 Implemented
AM0841 # 03 Y:2022 03 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,311 $0 Not Implemented
AM0841 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $140 $100 Implemented
AM0841 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $115 $13 Not Implemented
AM0774 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,150 $36,000 Not Implemented
AM0774 # 03 Y:2019 03 2019 ISOLATE HOT OR COLD EQUIPMENT $133,950 $353,500 Not Implemented
AM0774 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $180,556 $1,134,251 Not Implemented
AM0774 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,577 $17,085 Not Implemented
AM0774 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $48,197 $757,373 Not Implemented
AM0774 # 08 Y:2019 08 2019 USE SYNTHETIC LUBRICANT $2,349 $1,600 Not Implemented
AM0774 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $41,452 $72,710 Not Implemented
AM0774 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $200,328 $100 Not Implemented
OK0919 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,213 $6,000 Not Implemented