IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
NAICS 324 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1045 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,284 $453 Not Implemented
UD1045 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,938 $35,826 Not Implemented
UD1045 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $2,200 Not Implemented
UD1045 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $720 $1,000 Not Implemented
UD1045 # 02 Y:2022 02 2022 COMBINE UTILITY METERS $1,103 $0 Not Implemented
UD1045 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,883 $0 Not Implemented
UD1045 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,617 $32,900 Not Implemented
UD1045 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,605 $600 Not Implemented
UD1045 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,090 $27,500 Not Implemented
UD1045 # 10 Y:2022 10 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,319 $15,000 Not Implemented
OK1074 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $2,520 Implemented
OK1074 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $187 Not Implemented
OK1074 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $362 $0 Not Implemented
OK1074 # 04 Y:2022 04 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,213 $895 Implemented
OK1074 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $1,700 $611 Not Implemented
MA0839 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $88,663 $1,287,855 Not Implemented
MA0839 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,763 $3,268 Implemented
MA0839 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,751 $13,391 Implemented
MA0839 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $366 $2,775 Implemented
WV0622 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,152 $23,536 Not Implemented
WV0622 # 06 Y:2022 06 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $707 $2,525 Implemented
WV0622 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $252 $667 Implemented
WV0622 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $2,898 $11,215 Not Implemented
WV0622 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,610 $3,100 Implemented
WV0622 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $898 $300 Implemented