IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

819

matching recommendations
Reset
NAICS 3241 Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0703 # 02 Y:2018 02 2018 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,797 $13,333 Implemented
OR0703 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,525 $8,125 Implemented
OR0703 # 04 Y:2018 04 2018 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,908 $12,825 Not Implemented
OR0703 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,955 $4,730 Implemented
MA0785 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,893 $20,000 Implemented
MA0785 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $2,569 Not Implemented
MA0785 # 03 Y:2017 03 2017 KEEP BOILER TUBES CLEAN $1,014 $1,200 Implemented
MA0785 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $695 $959 Not Implemented
SF0505 # 01 Y:2017 01 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $23,294 $4,639 Not Implemented
SF0505 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $486 $86 Not Implemented
SF0505 # 03 Y:2017 03 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,070 $1,651 Not Implemented
SF0505 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,325 $6,323 Not Implemented
SF0505 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,816 $6,103 Not Implemented
SF0505 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,675 $28,219 Not Implemented
SF0505 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $3,828 $5,423 Implemented
SF0505 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $1,069 $1,882 Implemented
OR0685 # 01 Y:2017 01 2017 REPAIR AND ELIMINATE STEAM LEAKS $380,108 $83,637 Not Implemented
OR0685 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $90,626 $10,470 Not Implemented
OR0685 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $27,005 $27,335 Not Implemented
OR0685 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $59,155 $90,400 Not Implemented
OR0685 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,442 $2,012 Not Implemented
OR0685 # 06 Y:2017 06 2017 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,695 $10,499 Not Implemented
OR0680 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392 Implemented
OR0680 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,852 $150,000 Not Implemented
OR0680 # 03 Y:2017 03 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000 Implemented