Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
833
matching recommendationsNAICS | 3241 | Petroleum and Coal Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1002 # 06 Y:2019 | 06 | 2019 | INSTALL SET-BACK TIMERS | $1,083 | $802 | Implemented |
OK1002 # 07 Y:2019 | 07 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $39,703 | $37,000 | Not Implemented |
OK1001 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $1,894 | $955 | Not Implemented |
OK1001 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,799 | $3,509 | Implemented |
OK1001 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,474 | $11,240 | Not Implemented |
OK1001 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,178 | $16,224 | Not Implemented |
OK1001 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,655 | $15,329 | Not Implemented |
OR0713 # 01 Y:2018 | 01 | 2018 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $219,819 | $375,000 | Not Implemented |
OR0713 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,959 | $10,959 | Implemented |
OR0713 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,594 | $4,336 | Implemented |
OR0713 # 04 Y:2018 | 04 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $7,018 | $26,371 | Implemented |
OR0713 # 05 Y:2018 | 05 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,108 | $5,028 | Implemented |
OR0713 # 06 Y:2018 | 06 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $929 | $0 | Implemented |
OR0703 # 01 Y:2018 | 01 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,902 | $12,504 | Not Implemented |
OR0703 # 02 Y:2018 | 02 | 2018 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,797 | $13,333 | Implemented |
OR0703 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,525 | $8,125 | Implemented |
OR0703 # 04 Y:2018 | 04 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,908 | $12,825 | Not Implemented |
OR0703 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,955 | $4,730 | Implemented |
MA0785 # 01 Y:2017 | 01 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,893 | $20,000 | Implemented |
MA0785 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,469 | $2,569 | Not Implemented |
MA0785 # 03 Y:2017 | 03 | 2017 | KEEP BOILER TUBES CLEAN | $1,014 | $1,200 | Implemented |
MA0785 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $695 | $959 | Not Implemented |
SF0505 # 01 Y:2017 | 01 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $23,294 | $4,639 | Not Implemented |
SF0505 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $486 | $86 | Not Implemented |
SF0505 # 03 Y:2017 | 03 | 2017 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $7,070 | $1,651 | Not Implemented |