Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
108
matching recommendationsNAICS | 324121 | Asphalt Paving Mixture and Block Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0630 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $2,000 | n/a |
UF0630 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,407 | $25,400 | n/a |
UF0630 # 08 Y:2025 | 08 | 2025 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,256 | $2,120 | n/a |
UF0630 # 03 Y:2025 | 03 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,224 | $8,907 | n/a |
UF0630 # 06 Y:2025 | 06 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,264 | $14,760 | n/a |
UF0630 # 10 Y:2025 | 10 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $625 | $1,750 | n/a |
UF0630 # 11 Y:2025 | 11 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $11,572 | $20,000 | n/a |
UF0630 # 09 Y:2025 | 09 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $958 | $0 | n/a |
UF0630 # 12 Y:2025 | 12 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,323 | $0 | n/a |
UF0630 # 05 Y:2025 | 05 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $10,115 | $40,000 | n/a |
UF0630 # 02 Y:2025 | 02 | 2025 | KEEP SOLID FUELS / RAW MATERIALS DRY | $25,034 | $48,000 | n/a |
UF0630 # 01 Y:2025 | 01 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $66,329 | $8,820 | n/a |
DL0254 # 06 Y:2025 | 06 | 2025 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,559 | $7,500 | n/a |
DL0254 # 05 Y:2025 | 05 | 2025 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $6,715 | $20,000 | n/a |
DL0254 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,650 | $4,699 | n/a |
DL0254 # 03 Y:2025 | 03 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,746 | $7,000 | n/a |
DL0254 # 02 Y:2025 | 02 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $943 | $0 | n/a |
DL0254 # 08 Y:2025 | 08 | 2025 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $88,915 | $400,000 | n/a |
DL0254 # 07 Y:2025 | 07 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,855 | $58,000 | n/a |
DL0254 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,794 | $10,000 | n/a |
DL0253 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,718 | $0 | n/a |
DL0253 # 07 Y:2025 | 07 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,569 | $4,900 | n/a |
DL0253 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,889 | $20,000 | n/a |
DL0253 # 10 Y:2025 | 10 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $8,030 | $55,000 | n/a |
DL0253 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,417 | $7,500 | n/a |