IAC Assessment: UF0630
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0630
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2025
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 1,084,644
Annual Production 330,000 Tons
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,267 1,655,608 kWh $0.04
Electricity Demand $101,777 5,997 kW-months/year $16.97
Electricity Fees $4,463 - $ -
Natural Gas $505,738 81,348 MMBtu $6.22
TOTAL ENERGY COSTS $691,253
RECOMMENDED SAVINGS* $155,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$66,329
Cost:
$8,820
$(-525) (-11,940) $(-1,216) (-72) $68,070 10,949 - - - - $(-525)
(-11,940)
kWh
$(-1,216)
(-72)
kW-months/year
$68,070
10,949
MMBtu
-
-
$
-
-
$
02: 2.6126 KEEP SOLID FUELS / RAW MATERIALS DRY Savings:
$25,034
Cost:
$48,000
- - - - $25,034 4,027 - - - - -
-
kWh
-
-
kW-months/year
$25,034
4,027
MMBtu
-
-
$
-
-
$
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$12,224
Cost:
$8,907
$5,099 115,893 $7,125 420 - - - - - - $5,099
115,893
kWh
$7,125
420
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$10,115
Cost:
$2,000
- - - - $10,115 1,627 - - - - -
-
kWh
-
-
kW-months/year
$10,115
1,627
MMBtu
-
-
$
-
-
$
05: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$10,115
Cost:
$40,000
- - - - $10,115 1,627 - - - - -
-
kWh
-
-
kW-months/year
$10,115
1,627
MMBtu
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,264
Cost:
$14,760
$2,418 54,916 $6,846 403 - - - - - - $2,418
54,916
kWh
$6,846
403
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$6,407
Cost:
$25,400
$6,407 145,608 - - - - - - - - $6,407
145,608
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$1,256
Cost:
$2,120
$1,256 28,535 - - - - - - - - $1,256
28,535
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$958
Cost:
-
$715 16,264 - - - - $110 - $133 - $715
16,264
kWh
-
-
kW-months/year
-
-
MMBtu
$110
-
$
$133
-
$
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$625
Cost:
$1,750
$625 14,197 - - - - - - - - $625
14,197
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$11,572
Cost:
$20,000
$1,457 33,112 - - $10,115 1,627 - - - - $1,457
33,112
kWh
-
-
kW-months/year
$10,115
1,627
MMBtu
-
-
$
-
-
$
12: 4.662 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS Savings:
$1,323
Cost:
-
$299 6,804 - - $1,024 167 - - - - $299
6,804
kWh
-
-
kW-months/year
$1,024
167
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$155,222
Cost:
$171,757
$17,751 403,389 $12,755 752 $124,473 20,024 $110 - $133 - $17,751
403,389
kWh
$12,755
752
kW-months/year
$124,473
20,024
MMBtu
$110
-
$
$133
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost