IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

212

matching recommendations
Reset
NAICS 32419 Other Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2405 # 01 Y:2024 01 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,278 $0 Implemented
LS2405 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,023 $50 Not Implemented
LS2405 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,207 $25,301 Implemented
LS2405 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $155,225 $550,000 Implemented
LS2405 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,417 $135 Implemented
LS2405 # 06 Y:2024 06 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $129,015 $600,000 Not Implemented
OK1081 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,300 $1,230 Not Implemented
OK1081 # 02 Y:2023 02 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,608 $0 Implemented
OK1081 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $15,211 $2,252 Not Implemented
OK1081 # 05 Y:2023 05 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,026 $7,020 Implemented
OK1081 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,617 $218,400 Not Implemented
OK1081 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $600 Implemented
OK1081 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $3,920 $4,024 Not Implemented
OK1081 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,097 $11,114 Implemented
UD1045 # 10 Y:2022 10 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,319 $15,000 Not Implemented
UD1045 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,938 $35,826 Not Implemented
UD1045 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,284 $453 Not Implemented
UD1045 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $720 $1,000 Not Implemented
UD1045 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,605 $600 Not Implemented
UD1045 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,617 $32,900 Not Implemented
UD1045 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $2,200 Not Implemented
UD1045 # 02 Y:2022 02 2022 COMBINE UTILITY METERS $1,103 $0 Not Implemented
UD1045 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,090 $27,500 Not Implemented
UD1045 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,883 $0 Not Implemented
OK1074 # 04 Y:2022 04 2022 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,213 $895 Implemented