Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
189
matching recommendationsNAICS | 324191 | Petroleum Lubricating Oil and Grease Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2405 # 01 Y:2024 | 01 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,278 | $0 | Implemented |
LS2405 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,023 | $50 | Not Implemented |
LS2405 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,207 | $25,301 | Implemented |
LS2405 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $155,225 | $550,000 | Implemented |
LS2405 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,417 | $135 | Implemented |
LS2405 # 06 Y:2024 | 06 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $129,015 | $600,000 | Not Implemented |
OK1081 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,300 | $1,230 | Not Implemented |
OK1081 # 02 Y:2023 | 02 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,608 | $0 | Implemented |
OK1081 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $15,211 | $2,252 | Not Implemented |
OK1081 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,026 | $7,020 | Implemented |
OK1081 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $15,617 | $218,400 | Not Implemented |
OK1081 # 07 Y:2023 | 07 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,263 | $600 | Implemented |
OK1081 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,920 | $4,024 | Not Implemented |
OK1081 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,097 | $11,114 | Implemented |
UD1045 # 10 Y:2022 | 10 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,319 | $15,000 | Not Implemented |
UD1045 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,938 | $35,826 | Not Implemented |
UD1045 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,284 | $453 | Not Implemented |
UD1045 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $720 | $1,000 | Not Implemented |
UD1045 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $19,605 | $600 | Not Implemented |
UD1045 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,617 | $32,900 | Not Implemented |
UD1045 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,184 | $2,200 | Not Implemented |
UD1045 # 02 Y:2022 | 02 | 2022 | COMBINE UTILITY METERS | $1,103 | $0 | Not Implemented |
UD1045 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,090 | $27,500 | Not Implemented |
UD1045 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,883 | $0 | Not Implemented |
OK1074 # 04 Y:2022 | 04 | 2022 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,213 | $895 | Implemented |