IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,329

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0283 # 03 Y:2004 03 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,469 $1,200 Implemented
NC0283 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,077 $356 Implemented
MI0076 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,535 $1,370 Implemented
MI0076 # 04 Y:2004 04 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $3,936 $6,000 Implemented
MI0076 # 06 Y:2004 06 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $45,000 $23,400 Implemented
LE0183 # 02 Y:2004 02 2004 REPAIR OR REPLACE STEAM TRAPS $49,237 $10,000 Implemented
WI0464 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,856 $0 Implemented
WI0464 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,860 $1,000 Implemented
WI0459 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $640 Implemented
IC0075 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,105 $2,900 Implemented
NC0277 # 02 Y:2004 02 2004 DEVELOP A REPAIR/REPLACE POLICY $2,250 $710 Implemented
NC0277 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,330 $6,680 Implemented
NC0277 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $750 $782 Implemented
NC0277 # 06 Y:2004 06 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $1,049 $1,000 Implemented
MS0241 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $30,220 $20,410 Implemented
MS0241 # 04 Y:2003 04 2003 REPAIR AND ELIMINATE STEAM LEAKS $11,644 $760 Implemented
MS0241 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,378 $129 Implemented
MS0241 # 07 Y:2003 07 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,613 $0 Implemented
MS0241 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,854 $3,600 Implemented
UM0244 # 02 Y:2003 02 2003 SIZE TRUCKS TO JOB $76,800 $54,000 Implemented
UM0244 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,023 $521 Implemented
SU0170 # 03 Y:2003 03 2003 ADVERTISE PRODUCT OR SERVICE $31,250 $1,000 Implemented
SU0170 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,181 $47 Implemented
SU0170 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $57 Implemented
SU0170 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $185 Implemented