Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
136
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0661 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $641,754 | $589,764 | Implemented |
SD0661 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,243 | $7,340 | Implemented |
SD0661 # 13 Y:2024 | 13 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,043 | $19,842 | Implemented |
SD0661 # 11 Y:2024 | 11 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $970 | $1,863 | Implemented |
SD0661 # 06 Y:2024 | 06 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,354 | $0 | Implemented |
SD0661 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,348 | $676 | Implemented |
SD0661 # 02 Y:2024 | 02 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $1,321,862 | $54,390 | Implemented |
SD0661 # 07 Y:2024 | 07 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $854 | $250 | Implemented |
SD0661 # 05 Y:2024 | 05 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,205 | $0 | Implemented |
SD0657 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,983 | $13,634 | Implemented |
SD0657 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,186 | $10,841 | Implemented |
SD0657 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,534 | $5,677 | Implemented |
SD0657 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,484 | $6,349 | Implemented |
SJ0008 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $365 | $0 | Implemented |
SJ0008 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $265 | $344 | Implemented |
SD0621 # 02 Y:2021 | 02 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,887 | $10,000 | Implemented |
SD0621 # 01 Y:2021 | 01 | 2021 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,319 | $0 | Implemented |
SD0611 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $203 | $387 | Implemented |
SD0611 # 06 Y:2021 | 06 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $45,722 | $186,400 | Implemented |
SD0611 # 07 Y:2021 | 07 | 2021 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,308 | $6,000 | Implemented |
SD0611 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $30,193 | $22,050 | Implemented |
SD0593 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,483 | $0 | Implemented |
SD0572 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $349 | $378 | Implemented |
SD0572 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $970 | $1,350 | Implemented |
SD0572 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,372 | $0 | Implemented |