Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0241 # 05 Y:2024 | 05 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $2,300 | $7,800 | Not Implemented |
UU0241 # 06 Y:2024 | 06 | 2024 | INSULATE BARE EQUIPMENT | $1,150 | $3,710 | Not Implemented |
UU0241 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $650 | $2,200 | Not Implemented |
UU0241 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $589 | $750 | Implemented |
UW2402 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,442 | $5,083 | n/a |
UW2402 # 02 Y:2024 | 02 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,045 | $582 | n/a |
UW2402 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $282 | $1,742 | n/a |
UW2402 # 04 Y:2024 | 04 | 2024 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $55,000 | $117,000 | n/a |
UW2402 # 05 Y:2024 | 05 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $25,000 | $104,000 | n/a |
UW2402 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $17,310 | $375 | n/a |
UW2402 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $13,327 | $84,652 | n/a |
UW2402 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $49,076 | $311,400 | n/a |
UF0609 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,116 | $322,608 | n/a |
UF0609 # 02 Y:2024 | 02 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $38,174 | $25,504 | n/a |
UF0609 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,360 | $25,380 | n/a |
UF0609 # 04 Y:2024 | 04 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $14,767 | $40,488 | n/a |
UF0609 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,546 | $9,000 | n/a |
UF0609 # 06 Y:2024 | 06 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $35,940 | $0 | n/a |
UF0609 # 07 Y:2024 | 07 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $21,071 | $25,000 | n/a |
IC0297 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,288 | $1,336 | Implemented |
IC0297 # 02 Y:2024 | 02 | 2024 | INSULATE BARE EQUIPMENT | $5,801 | $2,620 | Implemented |
IC0297 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $2,641 | $1,066 | Implemented |
IC0297 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $26,122 | $13,370 | Implemented |
IC0297 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $2,433 | $1,693 | Implemented |
IC0297 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,704 | $1,123 | Not Implemented |