IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0321 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,346 $123,757 Implemented
SU0321 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $955 $4,144 Implemented
SU0321 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $7,620 $38,838 Not Implemented
SU0321 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $1,655 Implemented
SU0321 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $2,320 $4,530 Implemented
UMS011 # 01 Y:2012 01 2012 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,224,000 $1,300,000 Not Implemented
UMS011 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $275,000 $500,000 Not Implemented
UMS011 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $196,000 $300,000 Not Implemented
UMS011 # 04 Y:2012 04 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $113,000 $70,000 Not Implemented
UMS011 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $100,000 $200,000 Not Implemented
UMS011 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $40,000 $40,000 Not Implemented
DL0089 # 01 Y:2012 01 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,050 $6,800 Implemented
DL0089 # 02 Y:2012 02 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $7,675 $27,000 Implemented
DL0089 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,880 $0 Implemented
DL0089 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $620 $81 Implemented
DL0089 # 05 Y:2012 05 2012 USE OPTIMUM THICKNESS INSULATION $1,025 $2,275 Not Implemented
NC0456 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $36,693 $65,000 Not Implemented
NC0456 # 02 Y:2012 02 2012 REPAIR OR REPLACE STEAM TRAPS $34,238 $5,500 Implemented
NC0456 # 03 Y:2012 03 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $28,806 $60,000 Not Implemented
NC0456 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $100 Implemented
NC0456 # 05 Y:2012 05 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,045 $5,000 Not Implemented
TT0092 # 01 Y:2012 01 2012 REPAIR OR REPLACE STEAM TRAPS $18,416 $2,040 Implemented
TT0092 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $5,056 $2,500 Not Implemented
TT0092 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $1,269 $50 Not Implemented
TT0092 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,171 $3,000 Implemented