Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0321 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,346 | $123,757 | Implemented |
SU0321 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $955 | $4,144 | Implemented |
SU0321 # 06 Y:2012 | 06 | 2012 | OPTIMIZE PLANT POWER FACTOR | $7,620 | $38,838 | Not Implemented |
SU0321 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,284 | $1,655 | Implemented |
SU0321 # 08 Y:2012 | 08 | 2012 | ELIMINATE/REDUCE AN OPERATION | $2,320 | $4,530 | Implemented |
UMS011 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,224,000 | $1,300,000 | Not Implemented |
UMS011 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $275,000 | $500,000 | Not Implemented |
UMS011 # 03 Y:2012 | 03 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $196,000 | $300,000 | Not Implemented |
UMS011 # 04 Y:2012 | 04 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $113,000 | $70,000 | Not Implemented |
UMS011 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $100,000 | $200,000 | Not Implemented |
UMS011 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $40,000 | $40,000 | Not Implemented |
DL0089 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,050 | $6,800 | Implemented |
DL0089 # 02 Y:2012 | 02 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $7,675 | $27,000 | Implemented |
DL0089 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,880 | $0 | Implemented |
DL0089 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $620 | $81 | Implemented |
DL0089 # 05 Y:2012 | 05 | 2012 | USE OPTIMUM THICKNESS INSULATION | $1,025 | $2,275 | Not Implemented |
NC0456 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $36,693 | $65,000 | Not Implemented |
NC0456 # 02 Y:2012 | 02 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $34,238 | $5,500 | Implemented |
NC0456 # 03 Y:2012 | 03 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $28,806 | $60,000 | Not Implemented |
NC0456 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $997 | $100 | Implemented |
NC0456 # 05 Y:2012 | 05 | 2012 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,045 | $5,000 | Not Implemented |
TT0092 # 01 Y:2012 | 01 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $18,416 | $2,040 | Implemented |
TT0092 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,056 | $2,500 | Not Implemented |
TT0092 # 03 Y:2012 | 03 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $1,269 | $50 | Not Implemented |
TT0092 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,171 | $3,000 | Implemented |