IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,503

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0437 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,396 $2,000 Implemented
MA0672 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $128,581 $1,577,500 Not Implemented
MA0672 # 02 Y:2011 02 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,255 $8,150 Not Implemented
MA0672 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,909 $6,850 Not Implemented
MA0672 # 04 Y:2011 04 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,324 $14,800 Not Implemented
MA0672 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,965 $3,935 Implemented
MA0672 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,777 $8,300 Implemented
MA0672 # 07 Y:2011 07 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,750 $0 Implemented
IC0182 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $116 Not Implemented
IC0182 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $672 Not Implemented
IC0182 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $0 Not Implemented
IC0182 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,045 $43,859 Not Implemented
IC0182 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,734 $11,001 Not Implemented
IC0182 # 06 Y:2011 06 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,070 $0 Not Implemented
IC0182 # 07 Y:2011 07 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,314 $5,489 Not Implemented
IC0182 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $950 $311 Not Implemented
IC0182 # 09 Y:2011 09 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,442 $311 Not Implemented
IC0182 # 10 Y:2011 10 2011 INSTALL AUTOMATIC STACK DAMPER $5,217 $50,324 Not Implemented
IC0182 # 11 Y:2011 11 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,294 $921 Not Implemented
IC0182 # 12 Y:2011 12 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,314 $1,318 Not Implemented
IC0182 # 13 Y:2011 13 2011 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $379 $379 Not Implemented
IC0182 # 14 Y:2011 14 2011 OPTIMIZE PLANT POWER FACTOR $3,378 $20,932 Not Implemented
IC0182 # 15 Y:2011 15 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $110 $0 Not Implemented
OK0809 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,884 $59,335 Not Implemented
OK0809 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,809 $46,235 Implemented