Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
532
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0449 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,832 | $5,165 | Not Implemented |
UF0449 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $1,884 | $1,676 | Implemented |
UF0449 # 06 Y:2011 | 06 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $697 | $0 | Implemented |
UF0449 # 07 Y:2011 | 07 | 2011 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $3,726 | $1,919 | Not Implemented |
UF0449 # 08 Y:2011 | 08 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,799 | $7,128 | Not Implemented |
UF0449 # 09 Y:2011 | 09 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $659 | $686 | Implemented |
UF0449 # 10 Y:2011 | 10 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $227 | $21 | Implemented |
UF0449 # 11 Y:2011 | 11 | 2011 | USE OPTIMUM THICKNESS INSULATION | $1,450 | $576 | Not Implemented |
UF0445 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,864 | $4,542 | Implemented |
UF0445 # 02 Y:2011 | 02 | 2011 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $5,543 | $9,823 | Not Implemented |
UF0445 # 03 Y:2011 | 03 | 2011 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,693 | $939 | Not Implemented |
UF0445 # 04 Y:2011 | 04 | 2011 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $25,323 | $75,000 | Implemented |
UF0445 # 05 Y:2011 | 05 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $43,678 | $2,580 | Not Implemented |
UF0445 # 06 Y:2011 | 06 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,582 | $2,580 | Implemented |
UF0445 # 07 Y:2011 | 07 | 2011 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $802 | $1,378 | Not Implemented |
UF0445 # 08 Y:2011 | 08 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $735 | $1,280 | Not Implemented |
UF0445 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,370 | $8,778 | Implemented |
UF0445 # 10 Y:2011 | 10 | 2011 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $118,931 | $150,000 | Not Implemented |
UF0432 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,739 | $32,047 | Not Implemented |
UF0432 # 02 Y:2010 | 02 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,188 | $5,591 | Not Implemented |
UF0432 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $14,940 | $2,240 | Not Implemented |
UF0432 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,539 | $719 | Not Implemented |
UF0432 # 05 Y:2010 | 05 | 2010 | USE PHOTOCELL CONTROLS | $6,416 | $768 | Not Implemented |
UF0432 # 06 Y:2010 | 06 | 2010 | INSTALL COMMON HEADER ON COMPRESSORS | $1,520 | $0 | Not Implemented |
UF0432 # 07 Y:2010 | 07 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,000 | $2,700 | Not Implemented |