IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0361 # 07 Y:2007 07 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $1,150 $1,200 Implemented
NC0361 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $452 $500 Implemented
NC0361 # 09 Y:2007 09 2007 KEEP BOILER TUBES CLEAN $1,550 $2,395 Not Implemented
NC0361 # 10 Y:2007 10 2007 REDUCE EXCESSIVE BOILER BLOWDOWN $553 $0 Not Implemented
NC0361 # 11 Y:2007 11 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $376 $1,000 Not Implemented
UD0760 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $10,167 $6 Implemented
UD0760 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,480 $0 Implemented
UD0760 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $4,030 $2,760 Implemented
UD0760 # 04 Y:2007 04 2007 DEVELOP A REPAIR/REPLACE POLICY $3,677 $13,959 Implemented
UD0760 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,006 $1,250 Implemented
UD0760 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,886 $6,000 Implemented
UD0760 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,153 $2,634 Not Implemented
UD0760 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $563 $48 Implemented
UD0760 # 09 Y:2007 09 2007 USE PHOTOCELL CONTROLS $517 $105 Not Implemented
LL0271 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $78,849 $24,500 Not Implemented
LL0271 # 02 Y:2007 02 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $17,275 $1,587 Not Implemented
LL0271 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,710 $3,760 Implemented
LL0271 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $7,569 $3,000 Not Implemented
LL0271 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,159 $5,905 Implemented
LL0271 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,133 $15 Not Implemented
LL0271 # 07 Y:2007 07 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,580 $2,366 Implemented
LL0271 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $1,886 $1,500 Implemented
LL0271 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $365 $638 Implemented
LL0271 # 10 Y:2007 10 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $252 $454 Implemented
SF0340 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,354 $0 Implemented