IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0336 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,827 $5,934 Not Implemented
SF0336 # 05 Y:2006 05 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $22,164 $15,000 Not Implemented
SF0336 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31 $29,700 Not Implemented
SF0336 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $4,374 Not Implemented
SF0336 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $872 $2,849 Not Implemented
SF0336 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2 $7,040 Implemented
SF0336 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $234 $557 Implemented
SF0336 # 11 Y:2006 11 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $955 $2,480 Implemented
SF0336 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,076 $16,625 Implemented
SF0336 # 13 Y:2006 13 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $327 $6,381 Implemented
NC0345 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,498 $4,000 Not Implemented
NC0345 # 02 Y:2006 02 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,488 $8,000 Not Implemented
NC0345 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,461 $4,000 Not Implemented
NC0345 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,300 $50 Not Implemented
NC0345 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,538 $2,465 Not Implemented
NC0345 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $147 $95 Not Implemented
NC0345 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $291 $95 Implemented
LE0247 # 01 Y:2006 01 2006 REPLACE BOILER $115,080 $223,000 Not Implemented
LE0247 # 02 Y:2006 02 2006 REVISE RAW MATERIAL SPECS $106,250 $60,000 Not Implemented
LE0247 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $26,312 $16,000 Not Implemented
LE0247 # 04 Y:2006 04 2006 ADOPT IN-HOUSE MATERIAL GENERATION $24,012 $20,000 Implemented
LE0247 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,245 $15,000 Not Implemented
LE0247 # 06 Y:2006 06 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,646 $2,500 Implemented
LE0247 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,225 $1,152 Implemented
LE0247 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $1,181 $300 Not Implemented