IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0237 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,658 $3,000 Not Implemented
LE0237 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $3,162 $900 Implemented
GT0822 # 01 Y:2006 01 2006 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,995 $640 Implemented
GT0822 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,292 $10,800 Not Implemented
GT0822 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $97,628 $18,865 Implemented
GT0822 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,620 $850 Not Implemented
GT0822 # 05 Y:2006 05 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $60,069 $87,937 Not Implemented
GT0822 # 06 Y:2006 06 2006 COMBINE UTILITY METERS $4,697 $0 Not Implemented
GT0822 # 07 Y:2006 07 2006 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $450,000 $20,000 Implemented
GT0820 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $204,303 $0 Not Implemented
GT0820 # 02 Y:2006 02 2006 USE PHOTOCELL CONTROLS $15,359 $12,000 Not Implemented
GT0820 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,732 $1,390 Not Implemented
GT0820 # 04 Y:2006 04 2006 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $4,073 $10,200 Not Implemented
GT0820 # 05 Y:2006 05 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,650 $5,952 Not Implemented
LL0245 # 01 Y:2006 01 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,334,582 $60,000 Implemented
LL0245 # 02 Y:2006 02 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $2,369,946 $5,024,000 Not Implemented
LL0245 # 03 Y:2006 03 2006 REPAIR AND ELIMINATE STEAM LEAKS $323,360 $14,100 Implemented
LL0245 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $185,638 $4,644 Not Implemented
LL0245 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $45,203 $6,300 Implemented
LL0245 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,924 $11,000 Not Implemented
LL0245 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $12,103 $1,218 Implemented
LL0245 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,818 $3,500 Not Implemented
LL0245 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $1,010 $2,813 Not Implemented
WV0341 # 01 Y:2006 01 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,713 $2,370 Implemented
WV0341 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,073 $1,800 Implemented