IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0105 # 01 Y:2005 01 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $60,808 $100,000 Implemented
IC0105 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,211 $2,000 Implemented
IC0105 # 03 Y:2005 03 2005 REPAIR AND ELIMINATE STEAM LEAKS $17,271 $3,900 Implemented
IC0105 # 04 Y:2005 04 2005 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $12,910 $900 Not Implemented
IC0105 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,728 $42,000 Not Implemented
IC0105 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $94 $713 Not Implemented
IC0105 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $255 $714 Not Implemented
IC0105 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,344 $13,017 Not Implemented
LE0217 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $33,752 $27,000 Not Implemented
LE0217 # 02 Y:2005 02 2005 KEEP EQUIPMENT CLEAN $28,000 $840 Implemented
LE0217 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $16,487 $6,845 Implemented
LE0217 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,186 $3,000 Not Implemented
LE0217 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,202 $4,000 Not Implemented
LE0217 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,764 $900 Implemented
LE0217 # 07 Y:2005 07 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,158 $900 Implemented
LE0217 # 08 Y:2005 08 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,372 $263 Implemented
LE0217 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,389 $240 Not Implemented
LE0217 # 10 Y:2005 10 2005 INSTALL OCCUPANCY SENSORS $874 $150 Not Implemented
SU0211 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,599 $0 Not Implemented
SU0211 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $153 $0 Not Implemented
SU0211 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $659 $0 Not Implemented
SU0211 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,703 $444 Not Implemented
SU0211 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,210 $425 Not Implemented
MI0107 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,544 $600 Not Implemented
MI0107 # 02 Y:2005 02 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,756 $4,360 Not Implemented