IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0256 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,126 $422 Implemented
IC0091 # 01 Y:2004 01 2004 REPAIR OR REPLACE STEAM TRAPS $1,701 $638 Implemented
IC0091 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,038 $1,315 Implemented
IC0091 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,265 Implemented
IC0091 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $11,805 Not Implemented
IC0091 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,428 Not Implemented
IC0091 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $748 $2,287 Not Implemented
UU0074 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $29,620 $45,000 Not Implemented
UU0074 # 02 Y:2004 02 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $6,200 $17,000 Not Implemented
UU0074 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,750 $5,000 Not Implemented
UU0074 # 04 Y:2004 04 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,620 $4 Not Implemented
UU0074 # 05 Y:2004 05 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $19,210 $25 Not Implemented
UU0074 # 06 Y:2004 06 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,570 $12 Implemented
TA0088 # 01 Y:2004 01 2004 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $146,590 $20,000 Implemented
TA0088 # 02 Y:2004 02 2004 USE OPTIMUM THICKNESS INSULATION $86,400 $1,610 Not Implemented
TA0088 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $66,520 $1,010 Implemented
TA0088 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $20,580 $15,340 Not Implemented
TA0088 # 05 Y:2004 05 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $15,810 $2,000 Implemented
TA0088 # 06 Y:2004 06 2004 REDUCE OR ELIMINATE WASTE $18,000 $1,000 Implemented
TA0088 # 07 Y:2004 07 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,995 $1,000 Implemented
TA0088 # 08 Y:2004 08 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,000 $0 Not Implemented
GT0793 # 01 Y:2004 01 2004 COMBINE UTILITY METERS $5,142 $8,000 Not Implemented
GT0793 # 02 Y:2004 02 2004 USE SYNTHETIC LUBRICANT $2,500 $0 Not Implemented
GT0793 # 03 Y:2004 03 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,040 $0 Not Implemented
GT0793 # 04 Y:2004 04 2004 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $270 $758 Not Implemented