Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2307 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $6,269 | $41,061 | Not Implemented |
UC2307 # 05 Y:2023 | 05 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $508 | $529 | Not Implemented |
UC2307 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $411 | $3,486 | Not Implemented |
UC2307 # 07 Y:2023 | 07 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,643 | $34,992 | Not Implemented |
UC2307 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $383 | $455 | Not Implemented |
UC2307 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,108 | $31,637 | Not Implemented |
UC2307 # 10 Y:2023 | 10 | 2023 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,667 | $13,200 | Not Implemented |
UF0598 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $94,792 | $289,896 | Not Implemented |
UF0598 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $61,221 | $34,460 | Implemented |
UF0598 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $30,832 | $8,310 | Implemented |
UF0598 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $26,906 | $25,280 | Not Implemented |
UF0598 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,433 | $14,328 | Implemented |
UF0598 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $10,556 | $22,000 | Implemented |
UF0598 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,338 | $432 | Implemented |
UF0598 # 08 Y:2023 | 08 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $8,114 | $0 | Implemented |
UF0598 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $6,732 | $7,500 | Implemented |
UF0598 # 10 Y:2023 | 10 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,588 | $2,800 | Implemented |
UF0598 # 11 Y:2023 | 11 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,193 | $15,120 | Not Implemented |
OK1093 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,678 | $10,052 | Implemented |
OK1093 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $420 | $900 | Implemented |
OK1093 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,830 | $374,400 | Implemented |
OK1093 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,723 | $1,260 | Implemented |
OK1093 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,087 | $343 | Implemented |
OK1093 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,010 | $0 | Implemented |
OK1093 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,345 | $8,534 | Implemented |