IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2307 # 04 Y:2023 04 2023 REPLACE BOILER $6,269 $41,061 Not Implemented
UC2307 # 05 Y:2023 05 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $508 $529 Not Implemented
UC2307 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $411 $3,486 Not Implemented
UC2307 # 07 Y:2023 07 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,643 $34,992 Not Implemented
UC2307 # 08 Y:2023 08 2023 METER WASTE WATER $383 $455 Not Implemented
UC2307 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,108 $31,637 Not Implemented
UC2307 # 10 Y:2023 10 2023 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,667 $13,200 Not Implemented
UF0598 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $94,792 $289,896 Not Implemented
UF0598 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $61,221 $34,460 Implemented
UF0598 # 03 Y:2023 03 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $30,832 $8,310 Implemented
UF0598 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,906 $25,280 Not Implemented
UF0598 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,433 $14,328 Implemented
UF0598 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,556 $22,000 Implemented
UF0598 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,338 $432 Implemented
UF0598 # 08 Y:2023 08 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $8,114 $0 Implemented
UF0598 # 09 Y:2023 09 2023 INSTALL TURBULATORS $6,732 $7,500 Implemented
UF0598 # 10 Y:2023 10 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,588 $2,800 Implemented
UF0598 # 11 Y:2023 11 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,193 $15,120 Not Implemented
OK1093 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,678 $10,052 Implemented
OK1093 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $420 $900 Implemented
OK1093 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $29,830 $374,400 Implemented
OK1093 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,723 $1,260 Implemented
OK1093 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $343 Implemented
OK1093 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $0 Implemented
OK1093 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,345 $8,534 Implemented