IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

300

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0651 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $8,615 $1,485 Implemented
AM0651 # 08 Y:2014 08 2014 INSULATE FEEDWATER TANK $290 $320 Not Implemented
AM0651 # 07 Y:2014 07 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,630 $1,452 Not Implemented
AM0630 # 02 Y:2013 02 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,290 $1,600 Implemented
AM0630 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,500 $0 Not Implemented
AM0630 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,175 $0 Not Implemented
AM0630 # 10 Y:2013 10 2013 USE SYNTHETIC LUBRICANT $480 $0 Not Implemented
AM0630 # 11 Y:2013 11 2013 REUSE RAGS UNTIL COMPLETELY SOILED $480 $0 Implemented
AM0630 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,240 $350 Implemented
AM0630 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,270 $0 Implemented
AM0630 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,300 $1,040 Implemented
AM0630 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,450 $27,300 Implemented
AM0630 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $97,740 $5,000 Implemented
AM0630 # 01 Y:2013 01 2013 USE EVAPORATION TO CONCENTRATE MATERIAL $27,000 $5,000 Implemented
OK0809 # 08 Y:2011 08 2011 REPAIR AND ELIMINATE STEAM LEAKS $26,809 $375 Implemented
OK0809 # 09 Y:2011 09 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,755 $1,092 Implemented
OK0809 # 10 Y:2011 10 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,425 $595 Not Implemented
OK0809 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,485 $6,134 Implemented
OK0809 # 05 Y:2011 05 2011 DISCONNECT BALLASTS $20,420 $3,787 Implemented
OK0809 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,884 $59,335 Not Implemented
OK0809 # 12 Y:2011 12 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,221 $3,340 Not Implemented
OK0809 # 07 Y:2011 07 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,975 $17,104 Not Implemented
OK0809 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,066 $2,000 Implemented
OK0809 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,809 $46,235 Implemented
OK0809 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,472 $1,238 Implemented