IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0511 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,055 $140 Implemented
SU0511 # 03 Y:2022 03 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,490 $589 Not Implemented
SU0511 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $1,660 $4,595 Implemented
MI0404 # 01 Y:2022 01 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,220 $580 Implemented
MI0404 # 02 Y:2022 02 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,764 $479 Not Implemented
MI0404 # 03 Y:2022 03 2022 METER WASTE WATER $8,108 $1,533 Implemented
MI0404 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,549 $1,660 Not Implemented
MI0404 # 05 Y:2022 05 2022 REDUCE EXCESSIVE BOILER BLOWDOWN $1,720 $2,088 Not Implemented
MI0404 # 06 Y:2022 06 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,392 $2,520 Not Implemented
TT0268 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,947 $60,000 Not Implemented
TT0268 # 02 Y:2022 02 2022 REMOVE UNNEEDED SERVICE LINES TO ELIMINATE POTENTIAL LEAKS $17,027 $10,000 Not Implemented
TT0268 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $14,583 $49,071 Not Implemented
TT0268 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,268 $3,480 Not Implemented
TT0268 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,223 $500 Implemented
TT0268 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,691 $2,695 Not Implemented
TT0268 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,442 $6,000 Not Implemented
LS2207 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,349 $350 Not Implemented
LS2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,876 $30,073 Implemented
LS2207 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,432 $32,496 Implemented
LS2207 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,650 $158,575 Implemented
LS2207 # 05 Y:2022 05 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $136,185 $2,775,000 Not Implemented
AM0838 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $123,505 $10,000 Implemented
AM0838 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,090 $5,000 Implemented
AM0838 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,070 $10,152 Implemented
AM0838 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,720 $29,570 Implemented