IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

366

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0326 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,783 $0 Implemented
UF0326 # 07 Y:2003 07 2003 $48,872 $32,000 Not Implemented
UF0324 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $3,391 $5,036 Not Implemented
UF0324 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,045 $1,420 Not Implemented
UF0324 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,411 $546 Not Implemented
UF0324 # 04 Y:2003 04 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $836 $1,211 Not Implemented
UF0324 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,166 $0 Not Implemented
UF0324 # 06 Y:2003 06 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $17,482 $13,000 Not Implemented
LE0163 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $16,944 $40,000 Not Implemented
LE0163 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $11,718 $9,072 Not Implemented
LE0163 # 03 Y:2003 03 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $5,429 $1,434 Implemented
LE0163 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,773 $0 Implemented
LE0163 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,258 $0 Not Implemented
AS0360 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $10,607 Implemented
AS0360 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $344 $1,350 Not Implemented
AS0360 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,496 $30 Implemented
AS0360 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $10,463 $18,810 n/a
AS0360 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,253 $150 Implemented
AS0360 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $301 $616 Implemented
AS0360 # 07 Y:2003 07 2003 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $2,438 $8,705 Not Implemented
MS0224 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $936,645 $8,400,000 n/a
MS0224 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $351,990 $119,086 n/a
MS0224 # 03 Y:2003 03 2003 INSTALL STEAM TRAP $76,374 $12,262 Not Implemented
MS0224 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,515 $153,750 Not Implemented
MS0224 # 05 Y:2003 05 2003 MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM $37,053 $70,000 n/a