Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0479 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $210 | Implemented |
SF0479 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,397 | $4,166 | Implemented |
SF0479 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $846 | $2,490 | Implemented |
SF0479 # 05 Y:2016 | 05 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,263 | $204,396 | Not Implemented |
AM0701 # 01 Y:2016 | 01 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $515,000 | $75,000 | Implemented |
AM0701 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $195,000 | $2,000 | Implemented |
AM0701 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $73,125 | $105,700 | Implemented |
AM0701 # 04 Y:2016 | 04 | 2016 | PAY UTILITY BILLS ON TIME | $57,500 | $0 | Implemented |
AM0701 # 05 Y:2016 | 05 | 2016 | OPTIMIZE PLANT POWER FACTOR | $36,800 | $61,950 | Not Implemented |
AM0701 # 06 Y:2016 | 06 | 2016 | USE SYNTHETIC LUBRICANT | $35,540 | $0 | Implemented |
AM0701 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,900 | $22,740 | Not Implemented |
AM0701 # 08 Y:2016 | 08 | 2016 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,420 | $210 | Implemented |
AM0701 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $1,325 | $1,200 | Implemented |
MA0754 # 01 Y:2016 | 01 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,595,248 | $5,445,000 | Not Implemented |
MA0754 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $112,215 | $1,000 | Not Implemented |
MA0754 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,309 | $500,000 | Not Implemented |
MA0754 # 04 Y:2016 | 04 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $62,104 | $250,000 | Not Implemented |
MA0754 # 05 Y:2016 | 05 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,769 | $3,000 | Implemented |
MA0754 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,043 | $13,895 | Implemented |
MA0754 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,913 | $4,940 | Implemented |
MA0754 # 08 Y:2016 | 08 | 2016 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $1,151 | $500 | Not Implemented |
LE0414 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,057 | $0 | Implemented |
LE0414 # 02 Y:2016 | 02 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $34,860 | $36,000 | Implemented |
LE0414 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,251 | $1,460 | Not Implemented |
LE0414 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,088 | $14,625 | Implemented |