IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0148 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,529 $1,740 Implemented
UA0148 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,888 $870 Not Implemented
UA0148 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,998 $100 Not Implemented
UA0148 # 07 Y:2015 07 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,387 $1,800 Not Implemented
UD0935 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,152 $0 Implemented
UD0935 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,176 $3,100 Not Implemented
UD0935 # 03 Y:2015 03 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,230 $2,475 Not Implemented
UD0935 # 04 Y:2015 04 2015 REDUCE EXCESS STEAM BLEEDING $946,498 $1,450,100 Not Implemented
UD0935 # 05 Y:2015 05 2015 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $115,856 $487,083 Not Implemented
BS0060 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $674 $1,555 Not Implemented
BS0060 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $8,556 $17,382 Not Implemented
BS0060 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $294 $272 Implemented
BS0060 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,359 $2,116 Not Implemented
BS0060 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $479 $156 Not Implemented
BS0060 # 06 Y:2015 06 2015 UPGRADE CONTROLS ON COMPRESSORS $8,893 $26,927 Not Implemented
BS0060 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,499 $5,813 Not Implemented
BS0060 # 08 Y:2015 08 2015 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,056 $1,870 Not Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
OR0651 # 03 Y:2015 03 2015 RECOVER AND REUSE WASTE MATERIAL $93,635 $132,280 Not Implemented
UD0934 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $51,417 $0 Not Implemented
UD0934 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,375 $0 Not Implemented
UD0934 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $250 $224 Implemented
UD0934 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,235 $5,300 Not Implemented
UD0934 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,084 $2,000 Implemented