IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2216 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $1,095 $350 Implemented
LS2216 # 03 Y:2022 03 2022 USE PHOTOCELL CONTROLS $251 $74 Implemented
LS2216 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,044 $18,502 Implemented
LS2207 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,876 $30,073 Implemented
LS2207 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,650 $158,575 Implemented
LS2207 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,432 $32,496 Implemented
LS2108 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,759 $450 Implemented
LS2108 # 01 Y:2021 01 2021 REPAIR AND ELIMINATE STEAM LEAKS $7,669 $2,000 Implemented
LS2107 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,148 $450 Implemented
LS2107 # 03 Y:2021 03 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $981 $250 Implemented
LS2107 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $25 Implemented
LS2107 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,971 $5,165 Implemented
LS1905 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,646 $10,000 Implemented
LS1905 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,865 $3,000 Implemented
LS1905 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,408 $0 Implemented
LS1905 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,092 $50 Implemented
LS1801 # 01 Y:2018 01 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $69,575 $0 Implemented
LS0005 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,997 $3,280 Implemented
LS0005 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $7,832 $100 Implemented
LS0005 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,795 $4,000 Implemented
LS0005 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,903 $21,300 Implemented
LS0005 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $347 $585 Implemented
LS0005 # 08 Y:2017 08 2017 INSTALL TIMERS AND/OR THERMOSTATS $330 $400 Implemented
AM0701 # 02 Y:2016 02 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $195,000 $2,000 Implemented
AM0701 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,125 $105,700 Implemented