IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0643 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,445 $139,040 Implemented
NC0643 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $34,280 $75,000 Not Implemented
NC0643 # 05 Y:2019 05 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,463 $300,000 Not Implemented
NC0643 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,881 $30,000 Not Implemented
NC0643 # 02 Y:2019 02 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,495 $1,000 Implemented
NC0618 # 03 Y:2018 03 2018 AVOID REWINDING MOTORS MORE THAN TWICE $2,752 $5,685 Not Implemented
NC0618 # 06 Y:2018 06 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,172 $500 Not Implemented
NC0618 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,360 $0 Not Implemented
NC0618 # 04 Y:2018 04 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,341 $2,450 Not Implemented
NC0618 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $909 $750 Not Implemented
NC0618 # 01 Y:2018 01 2018 CLEAN CONDENSER TUBES $226,480 $50,000 Not Implemented
NC0605 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $3,455 $11,302 Implemented
NC0605 # 03 Y:2017 03 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $118 $50 Implemented
NC0605 # 01 Y:2017 01 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,044 $93,000 Not Implemented
NC0605 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,828 $10,328 Implemented
NC0605 # 06 Y:2017 06 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $65,888 $500 Implemented
NC0605 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $2,000 Implemented
NC0605 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $812 $1,000 Not Implemented
NC0574 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $1,303 $150 Implemented
NC0574 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $33,367 $49,000 Not Implemented
NC0574 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,055 $1,605 Not Implemented
NC0574 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,150 $5,360 Implemented
NC0574 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $138,968 $500 Implemented
NC0574 # 02 Y:2016 02 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,850 $30,000 Not Implemented
NC0574 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $63 $50 Implemented